3.159. Why do I have an unusually high production time when doing painted signs?

I am showing 4 hours of production time for a simple painted background with one coat of paint. Why is this so high?

Your minimum for painting a background may be set arbitrarily high. Lower the minimum and the production times should look normal. The procedure is as follows:
1. From EstiMate's main screen click Management>Configure EstiMate.
2. Click on the minimums tab and look at the entry labeled 'What is your min. charge to paint a sign background (labor & materials)' it should not be too far off the default of $10.00. If it is you may want to consider lowering the figure to normalize production time when quoting a painted sign.
3. Click the green OK checkmark to return to the main screen.